Industrial fabrication depends heavily on accurate, well-defined BIM models. Whether you’re planning equipment installation, prefabrication, or site coordination, selecting the right Level of Detail (LOD) in BIM determines the accuracy, cost, and constructability of your project.
Two of the most commonly compared LODs are LOD 400 and LOD 500. While they may seem similar, they serve completely different purposes—one for fabrication and installation, the other for facility management and lifecycle operations.
This guide breaks down the differences, use cases, and best practices to help fabrication teams, contractors, and facility managers choose the right LOD for their needs.
🔧 What LOD Actually Means in BIM
The Level of Detail (LOD) defines how much graphical and non-graphical information a BIM element contains.
The common LOD stages include:
- LOD 100 – Concept
- LOD 200 – Approximate geometry
- LOD 300 – Accurate geometry & location
- LOD 350 – Interfaces with nearby elements
- LOD 400 – Fabrication-level detail
- LOD 500 – As-built, verified field conditions
For industrial environments—manufacturing plants, food processing, refineries, warehouses—the difference between LOD 400 and LOD 500 has a major operational impact.
🔩 What Is LOD 400? (Fabrication-Level Detail)
LOD 400 models contain enough detail to directly support:
- Prefabrication
- Module assembly
- Shop drawings
- Quantity takeoffs
- Exact equipment placement
- Coordination with trades
Elements modeled at LOD 400 typically include:
- Precise geometry
- Dimensions and tolerances
- Connection details
- Material specifications
- Installation requirements
When LOD 400 Is Used
LOD 400 is ideal when your goal is to build or fabricate something directly from the model.
Use cases include:
- Industrial piping spool fabrication
- HVAC duct fabrication
- Skid assembly modeling
- Electrical conduit routing
- Equipment anchor placements
- Modular plant units
Why Fabricators Prefer LOD 400
Because it is:
- Accurate enough for cutting, welding, and assembly
- Detailed enough for CNC and automation workflows
- Close to real-world geometry
- Less expensive than creating as-built models
LOD 400 is your construction-ready model.
🏭 What Is LOD 500? (As-Built Verification)
LOD 500 represents the actual installed conditions, verified on site—often using 3D laser scanning or field measurement.
LOD 500 elements include:
- Final dimensions
- Exact installation locations
- Manufacturer details
- Serial numbers
- Maintenance data
- Performance parameters
When LOD 500 Is Used
LOD 500 is created after installation for:
- Facility management
- Asset tracking
- Operations & maintenance (O&M)
- Renovation planning
- Lifecycle management
Why Owners & Facility Managers Prefer LOD 500
Because it provides:
- Accurate as-built documentation
- A single source of truth for FM teams
- Real data for digital twins
- Better long-term operations
LOD 500 supports post-construction workflows—not fabrication.
🔍 Key Differences: LOD 400 vs. LOD 500
In short:
LOD 400 is for building,
LOD 500 is for operating the built asset.
🏗️ Which One Should You Choose?
Choose LOD 400 If:
- Your project requires prefabrication
- You need shop drawings
- Accurate modeling is needed for installation
- You’re coordinating complex MEP trades
- You want clash-free construction
Choose LOD 500 If:
- You need an as-built digital record
- Your facility requires accurate O&M documentation
- You want to maintain assets digitally
- You’re preparing for renovations or expansions
- You plan to implement a digital twin
💰 Cost Consideration: Don’t Choose Higher LOD Than Needed
LOD 500 is more expensive because it requires:
- On-site verification
- 3D laser scanning
- More detailed property data
If your project does not require lifecycle management or as-built accuracy, LOD 400 is usually sufficient and more cost-effective.
🔧 Industrial Fabrication Scenarios (Examples)
📌 Scenario 1: Pipe Spool Fabrication
Best LOD: 400 -> Reason: Exact geometry and connections required for workshop fabrication.
📌 Scenario 2: Commissioning a New Industrial Plant
Best LOD: 500 -> Reason: Owners need verified data for long-term maintenance.
📌 Scenario 3: Modular Equipment Skid Design
Best LOD: 400 -> Reason: Modules must be fabricated off-site with precision.
📌 Scenario 4: Lifecycle Asset Management
Best LOD: 500 -> Reason: Facility teams require real as-built data for every asset.
🧭 Best Practice: Start with LOD 300 → Upgrade to LOD 400 → Finalize with LOD 500
Many teams follow a progressive LOD approach:
- LOD 300 for design coordination
- LOD 350/400 for fabrication + installation
- LOD 500 after construction for accurate as-builts
This ensures efficiency, accuracy, and reduced rework.
📄 Final Thoughts
Choosing between LOD 400 and LOD 500 depends on your core need:
- Build it? → Go for LOD 400
- Maintain it? → Choose LOD 500
Each serves a critical function in the industrial lifecycle. Understanding the distinction helps teams avoid overspending, prevent errors, and ensure that the fabrication-to-operation workflow remains smooth and predictable.